Constraint analyzer

The constraint analyzer allows you to verify the feasibility of your timetable. It must be used without fail and you must settle all the problematic situations before the automatic placement.

Launch the constraint analyzer

  1. Go to the menu Calculation > Launch the constraint analyzer.
  2. In the popup window, click on the button Launch the verification.
  3. When a problem is detected, EDT proposes one or several ways to resolve it: implement one of the proposed solutions, then relaunch the verification to know if your modifications were sufficient.
  4. Correct all the errors or incoherence identified by the analyzer. When there are no longer any incoherence detected, you can start the placement (Automatic placement).